RelationDigest

Sunday, 30 April 2023

[New post] Doll House for My Sister – 3rd Phase

Site logo image David posted: "Continued from: Doll House for My Sister – 2nd Phase With the first-floor walls in place, I could now add the baseboards to the large green room… …and the faux tile floor to the kitchen. My sister planned to build all of her cabinets and applianc" onecreativescientist

Doll House for My Sister – 3rd Phase

David

Apr 30

Continued from: Doll House for My Sister – 2nd Phase

With the first-floor walls in place, I could now add the baseboards to the large green room…

…and the faux tile floor to the kitchen.

My sister planned to build all of her cabinets and appliances and so asked me not to add baseboards to the kitchen until they were finished and could be mounted flush to the walls.

My sister had also decided to upgrade the two doors from those included with the kit…

…and so, I could add the front door at this point as well.

When I temporarily placed the 2nd floor floor/1st floor ceiling in place, I noticed I had an issue.

The blue kitchen wall below was supposed to line up at the top with the cutout for the stairs.  It turned out to be 3/32" off.  I angst over this for a day trying to figure out how best to resolve it when I realized I could just move the stair opening over by cutting into the left side by 3/32" (note pencil line on left side of stair opening) and then filling in the right-side gap with a piece of trim that just so happened to be 3/32" thick.

The day I was going to fix this, I texted my sister a picture of the mistake and interestingly she relied back that she was considering not including staircases to allow more space for furniture (the stairs as seen in the photo below of the first house we built together, while elegant looking do actually take up a large amount of space in this small bedroom and the kitchen below).

The kit included wall dividers that we had not planned to use but were just the right thickness.  I cut a square from one, glued it in place and then used spackling to hide my poor cuts (MDF is a hard material to cut through).

Once I painted it with the white ceiling paint, I could barely tell where the patch was.

With the patch in place, I proceeded to lay down the walnut strips in the two second-floor rooms.

I followed the same approach with the only difference being this time I did not pre-cut the strips but rather cut them row by row as I figured out the appropriate length to use.  And to avoid wasting the ½ inch extra from the 11.5" veneer strip lengths, I cut lengths that included additions of ¼, ½, or ¾ inches.  With both rooms floored, I could now remove the second-floor and sand and add polyurethane as before.

With a nice finish to the flooring complete and the floor glued in place, I could then begin to add all of the second-floor walls.

Once the walls had dried, I could then add the baseboards and the door leading out to the second-floor porch.

Meanwhile, I had been working on painting the porch posts and railings.  The only problem I encountered was one of the four tall porch posts was severely warped.  But thankfully, the kit manufacturer gladly mailed me a replacement at no charge.

For the balusters (dowel rods), I used the same technique as before spreading a thin layer of paint on one sponge and then rolling the dowels, five at a time over the paint with a second sponge.

Once I had the posts, railings and balusters all painted, I could then assemble the nine individual railings using the templates in the instructions.

And as with the previous house, I wanted to add the 3-layer trim to the two attic ends and the gable end before installing them on the house since it was easier to measure and cut when these were flat on my work surface.  I recalled this had been one of the most difficult steps on that house to get the left and right trim pieces to line up properly without a gap between the two.  Using the same technique as before, I made my first two cuts and discovered I had the same problem with an unsightly gap at the apex.

When I cut the next two smaller trim pieces that would be on top of the first two, I found I still had the same gap issue.  On the last doll house, I had empirically determined that the roof apex angle was 70 degrees which meant each piece needed a 35-degree cut.  The gap at the top made me think the angle was too shallow.  So, I decided to try using a 36-degree cut (which would sum up to 72 degrees) and rather than using the saw blade to cut along my protractor to get that angle, I used a straight edge to accurately draw a line on the trim piece and then cut it clamped down on my work bench.

That seemed to be the issue with the gaps as my next cuts for the second and third trim pieces came out nearly perfect.

The last step for these six trim pieces was to figure out how long they needed to be cut so that they would be flush with the false eave at the bottom of the attic or gable end.  To determine this, I needed to temporarily set all three on the third floor with the front and back roof panels in place.  That would then allow the false eave to sit at the correct angle with the front and back roof panels so that I could then accurately measure the proper length of all six trim pieces.

I then repeated this process for the other attic end as well as the gable wall (front of house).  With all 18 pieces cut, I then had to paint each piece either the off-white color or the dark green color.  With all the roof pieces in place, I could then glue the trim pieces to the left attic, right attic, or gable wall.

Finishing the exterior of these third-floor walls required a similar approach for the horizontal trim pieces, although this could completely be done on the flat work surface since they fit within the previously glued roof line trim pieces.

     To be continued…

Comment
Like
Tip icon image You can also reply to this email to leave a comment.

Unsubscribe to no longer receive posts from onecreativescientist.
Change your email settings at manage subscriptions.

Trouble clicking? Copy and paste this URL into your browser:
http://onecreativescientist.com/2023/04/30/doll-house-for-my-sister-3rd-phase/

WordPress.com and Jetpack Logos

Get the Jetpack app to use Reader anywhere, anytime

Follow your favorite sites, save posts to read later, and get real-time notifications for likes and comments.

Download Jetpack on Google Play Download Jetpack from the App Store
WordPress.com on Twitter WordPress.com on Facebook WordPress.com on Instagram WordPress.com on YouTube
WordPress.com Logo and Wordmark title=

Learn how to build your website with our video tutorials on YouTube.


Automattic, Inc. - 60 29th St. #343, San Francisco, CA 94110  

at April 30, 2023
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Team Up With the Person Against the Problem

Listen now (8 mins) | This chapter explains that when a partner shares their struggles or temptations with you, it's an opportunity to w...

  • [New post] Wiggle Kingdom: April Earnings on Spring Savings!
    Betsi...
  • [New post] Balancing the ‘E’ and ‘S’ in Environment, Social and Governance (ESG) crucial to sustaining liquidity and resilience in the African loan market (By Miranda Abraham)
    APO p...
  • Something plus something else
    Read on bl...

Search This Blog

  • Home

About Me

RelationDigest
View my complete profile

Report Abuse

Blog Archive

  • August 2025 (23)
  • July 2025 (59)
  • June 2025 (53)
  • May 2025 (47)
  • April 2025 (42)
  • March 2025 (30)
  • February 2025 (27)
  • January 2025 (30)
  • December 2024 (37)
  • November 2024 (31)
  • October 2024 (28)
  • September 2024 (28)
  • August 2024 (2729)
  • July 2024 (3249)
  • June 2024 (3152)
  • May 2024 (3259)
  • April 2024 (3151)
  • March 2024 (3258)
  • February 2024 (3046)
  • January 2024 (3258)
  • December 2023 (3270)
  • November 2023 (3183)
  • October 2023 (3243)
  • September 2023 (3151)
  • August 2023 (3241)
  • July 2023 (3237)
  • June 2023 (3135)
  • May 2023 (3212)
  • April 2023 (3093)
  • March 2023 (3187)
  • February 2023 (2865)
  • January 2023 (3209)
  • December 2022 (3229)
  • November 2022 (3079)
  • October 2022 (3086)
  • September 2022 (2791)
  • August 2022 (2964)
  • July 2022 (3157)
  • June 2022 (2925)
  • May 2022 (2893)
  • April 2022 (3049)
  • March 2022 (2919)
  • February 2022 (2104)
  • January 2022 (2284)
  • December 2021 (2481)
  • November 2021 (3146)
  • October 2021 (1048)
Powered by Blogger.